Storage Tank Replacement at the Alexandria Rail Yard

  • Home
  • /
  • Storage Tank Replacement at the Alexandria Rail Yard
Project Owner
WMATA Washington Metropolitan Area Transit Authority
Contract Value
$5,844,545.00
Architect/Engineer
URS
Project Location
Alexandria, VA
Project Duration
03/19 – 9/20
Discipline
Civil, Concrete, Utility, Mechanical, Electrical, Above & Below Ground Storage Tanks

Project Description

Project includes the Removal of four (4) underground storage tanks (USTs) (gasoline, diesel); install three (3) new USTs; install one (1) new diesel exhaust fluid (DEF) aboveground storage tank (AST) in the main fueling area. The work involves Dewatering, Heavy Shoring, Excavation, Tank removal & Installation, Plumbing, Mechanical, Electrical & Concrete work.