Project Owner WMATA Washington Metropolitan Area Transit Authority |
Contract Value $5,844,545.00 |
Architect/Engineer URS |
Project Location Alexandria, VA |
Project Duration 03/19 – 9/20 |
Discipline Civil, Concrete, Utility, Mechanical, Electrical, Above & Below Ground Storage Tanks |
Storage Tank Replacement at the Alexandria Rail Yard
- Home /
- Storage Tank Replacement at the Alexandria Rail Yard
Project Description
Project includes the Removal of four (4) underground storage tanks (USTs) (gasoline, diesel); install three (3) new USTs; install one (1) new diesel exhaust fluid (DEF) aboveground storage tank (AST) in the main fueling area. The work involves Dewatering, Heavy Shoring, Excavation, Tank removal & Installation, Plumbing, Mechanical, Electrical & Concrete work.