Project Owner Capitol Region Airport Commission |
Contract Value $930,516 |
Architect/Engineer Pace Collaborative Mech/Elect Engineers/td> |
Project Location Richmond, VA |
Project Duration Oct 20 – Aug 21 |
Discipline Fire Suppression |
Richmond Airport Garage Sprinkler Upgrade
- Home /
- Richmond Airport Garage Sprinkler Upgrade
Project Description
Replacement of the fully automatic dry pipe fire extinguishing sprinkler system providing full coverage of the two level rental car parking garage. Addition of a new nitrogen generator system, replacement of the compressed air system, upgrade to the electric distribution system and replacement of the architectural metal ceiling system.