Project Owner Washington Suburban Sanitary Commission |
Contract Value $2,377,000.00 |
Architect/Engineer WRA |
Project Location Potomac WFP, Potomac, MD 20854 |
Project Duration 406 Days from NTP |
Discipline Electrical, Demolition, Concrete |
Potomac High Zone Pumps 7 & 8 LCI Drives Replacement
- Home /
- Potomac High Zone Pumps 7 & 8 LCI Drives Replacement

Project Description
Demolition and replacement of pumps 7 and 8 LCI drives with VFDs; demolition and replacement of pumps 7 and 8 motors; demolition and installation of electrical conduit, wires, and related appurtenances; modification of electrical and control panels; and installation of equipment pads.