Petersburg Multi-Modal Transit Facility

  • Home
  • /
  • Petersburg Multi-Modal Transit Facility
Project Owner
City of Petersburg
Contract Value
$18,529,957
Architect/Engineer
Wendel Duchscherer
Project Location
Petersburg, VA
Project Duration
Completed 2011
Discipline
Transportation, Municipal

Project Description

The Petersburg Multi-modal Transit Facility was built to replace the existing aging bus stop with a vibrant high-class facility in downtown Petersburg, VA. The facility helped to start a downtown revitalization process that has continued though today. The structure is concrete, structural steel, and face brick with a maximum amount of glass along with beautiful terrazzo floors and metal ceilings and polished handrails. The building was built to house a huge atrium and includes a large clock tower. All of the bus areas have covered walkways and canopies.

A link to one of our proud subcontractors website is below.
http://doyledickersonterrazzo.com/projects/transportation/petersburg-multi-modal-transit-center/