Project Owner MWAA (Metropolitan Washington Airports Authority) |
Contract Value $19,422,000.00 |
Architect/Engineer Aero Systems Engineering |
Project Location Washington Dulles International Airport, Dulles, VA |
Project Duration 08/2019 to 04/2022 |
Discipline Civil, Concrete Rehab, Crack Repair, Fuel Work, Utility Below Ground. |
Iad Concourse C/d Hydrant Fueling And Pavement Rehab
- Home /
- Iad Concourse C/d Hydrant Fueling And Pavement Rehab

Project Description
The work consists of the design and installation of five (5) isolation valve pits, piping, demolition, tie-in to existing fuel piping and other appurtenances, pavement cutting and appropriate repairs/replacement including temporary and permanent modification of airfield pavement markings on the existing hydrant fueling main segments at Concourse C and D.