Iad Concourse C/d Hydrant Fueling And Pavement Rehab

  • Home
  • /
  • Iad Concourse C/d Hydrant Fueling And Pavement Rehab
Project Owner
MWAA (Metropolitan Washington Airports Authority)
Contract Value
$19,422,000.00
Architect/Engineer
Aero Systems Engineering
Project Location
Washington Dulles International Airport, Dulles, VA
Project Duration
08/2019 to 04/2022
Discipline
Civil, Concrete Rehab, Crack Repair, Fuel Work, Utility Below Ground.

Project Description

The work consists of the design and installation of five (5) isolation valve pits, piping, demolition, tie-in to existing fuel piping and other appurtenances, pavement cutting and appropriate repairs/replacement including temporary and permanent modification of airfield pavement markings on the existing hydrant fueling main segments at Concourse C and D.